Commercial & Industrial BESS · Liquid-Cooled · Outdoor Cabinet

200 kW / 418 kWh in one outdoor cabinet.

HLY-BESS-Commercial-Industrial-418kWh
The 418 kWh cabinet is Henley Power’s largest C&I outdoor BESS — 200 kW / 418 kWh at 1,331 Vdc, LFP chemistry across eight liquid-cooled modules. Rated at 10,000 cycles at 80% DoD to 70% SOH end-of-life. 25-year design life. Operating range −20°C to +55°C charge, −20°C to +50°C discharge. Stackable to 40 cabinets — 8 MW / 16.7 MWh on one BMS. Engineered and manufactured by Henley Power in Shandong, China; European projects serviced from Romania.

418 kWh

Capacity
LFP · 314 Ah

200 kW

Power
0.5C · 2-hour discharge

≥94%

DC–AC–DC system

10,000

80% DoD · 25°C
PRODUCT FEATURES

Four reasons engineers specify the 418.

Cell ΔT ≤ 2°C · liquid cooling at C&I scale

Intelligent Liquid Cooling

Closed-loop ethylene glycol holds cell ΔT under 2°C. Most C&I cabinets run air-cooled at 5–8°C spread. Tighter thermal uniformity is the biggest single lever on cycle life.
1,331 Vdc · lower current · less copper

High-Voltage DC Architecture

1,331 Vdc nominal — near the upper envelope of 1,500 V-rated equipment. Higher voltage means lower current, smaller cables, smaller switchgear, lower I²R losses. The savings land in BoP cost.
Triple fire protection · pack + cabinet + detection

Three-Layer Fire Suppression

Pack-level Novec, cabinet-level aerosol, CO and thermal detection on every module. UL 9540A tested. It’s more expensive than single-layer alternatives — engineers who read insurance terms understand why we made this standard, not optional.
Stackable to 16.7 MWh · 40 cabinets · one EMS

One BMS Architecture, One to Forty Cabinets

Single cabinet: 200 kW site anchor. Forty in parallel: 8 MW / 16.7 MWh on one BMS. Same architecture, same EMS, same warranty — cabinet count is the only variable.
TECHNICAL SAPECIFICATIONS

One cabinet. Three deployment modes.

Top of Henley Power’s C&I range, sharing BMS architecture, EMS, and warranty structure with the 261 and 112. Spec table reflects Mode A (All-in-One integrated PCS). All values per IEC 62933-2-1.
HLY-DS-BESS-CI-418kWh-v3 · May 2026

Parameter

HLY-BESS-Commercial-Industrial-418kWh

Battery System
Cell chemistryLiFePO₄ (LFP) — Cobalt-Free · EU Reg 2023/1542
Cell specification3.2 V / 314 Ah prismatic
Battery configuration1P416S (8 × 1P52S modules)
Nominal DC voltage1,331 V
DC voltage range1,040 – 1,498 V
Rated energy capacity418 kWh
Charge / discharge rate0.1C to 0.5C
Cycle life≥ 10,000 @ 80% DoD · 0.5C · 25°C EOL threshold: 70% SOH. Test method: IEC 62620 + Henley extended homologation protocol. Third-party test reports under NDA.
Round-trip efficiency (RTE)≥ 94% (system level, DC–AC–DC)
Design life25 years
Warranty5 years system · 5 years optional extension (battery)
Power Conversion System (PCS) — Mode A: All-in-One Integrated
Rated AC power200 kW (215 kW and 225 kW PCS configurations optional — confirmed at order)
AC output voltage690 V (±15%) · 3-phase
Frequency50 / 60 Hz
PCS efficiency≥ 99%
Power factor / THDi−1 to +1 adjustable · ≥ 0.99 rated · THDi ≤ 3%
Overload1.1× continuous · 1.2× for 1 minute
Response timePCS capability ≤ 20 ms · Full system activation < 500 ms
Thermal Management & Environment
Cooling methodIntelligent Liquid Cooling · Cell ΔT ≤ 2°C
Operating temperature (charge)0°C to +55°C
Operating temperature (discharge)−20°C to +50°C
Storage temperature−30°C to +60°C
Max. operating altitude4,000 m (derated above 2,000 m)
Noise level≤ 75 dB(A) at 1 m
Enclosure & Protection
Cabinet typeOutdoor cabinet · plug-and-play
IP ratingIP54 (cabinet) · IP65 (battery module) · IP66 (PCS)
Anticorrosion gradeC4 standard · C5 optional (coastal & marine)
Cabinet colourRAL 7035 standard · custom RAL on request
Safety & Fire Protection
Fire detectionPack-level thermal runaway · CO + temperature per module
Fire suppressionPack-level Novec · cabinet-level aerosol
Explosion protection3-level design · pressure relief vents
StandardsUL 9540A · IEC 62619 · UL 1973 · UN 38.3
Communication & Control
Communication protocolModbus TCP · Modbus RTU · CAN · IEC 60870-5-104 · IEC 61850-7-420 DER profile (opt.) · DNP3
Communication interfaceCAN / RJ45 / RS485 / Ethernet
EMS platformCloud EMS · AI dispatch · OTA upgrade · remote O&M 24/7
Service
Service regionsNine regions — EU · Eastern Europe · Central Asia · Middle East · SE Asia · W Africa · N Africa · E Africa · S Africa
Lead time35 days ex-works from contract signature and deposit
Values per IEC 62933-2-1. Specifications subject to change.
TOPOLOGY . DEPLOYMENT MODES

Three ways to deploy the 418.

Three power-conversion topologies. Battery, BMS, thermal, and EMS are identical across all three. Only the PCS strategy differs — choose by site architecture and target dispatch markets.
Mode A · All-in-One

Integrated PCS

On-board PCS at 200 kW (215 / 225 kW optional). Plug-and-play for single-cabinet C&I behind-the-meter: peak-shaving, demand-charge management. Direct AC interconnect at 690 V three-phase.
SKU · HLY-BESS-Commercial-Industrial-418kWh
Mode B · DC-only

+ Central PCS 630–2,500 kW

DC-only block, multiple cabinets sharing one central inverter. Fewer conversion stages, lower cost per MWh at array scale. Suited to FCR / aFRR / arbitrage and solar-plus-storage co-location.
SKU · HLY-BESS-Commercial-Industrial-418kWh-DC
Mode C · DC-only

+ Hybrid inverter 30–125 kW

DC-only block with hybrid inverter handling both PV MPPT and battery dispatch. Best fit for commercial rooftops, light industrial, and small islanded microgrids with on-site PV.
SKU · HLY-BESS-Commercial-Industrial-418kWh-DC + HLY-Inverter-Hybrid
Parameter
Mode A · Integrated
Mode B · Central PCS
Mode C · Hybrid Inverter
PCS source
On-board, integrated in cabinet
External central PCS, separate skid
External hybrid inverter (PV + BESS)
Rated AC power
200 kW (215, 225 kW optional)
630 / 1,000 / 1,250 / 1,500 / 2,000 / 2,500 kW
30 / 50 / 60 / 100 / 125 kW
Typical scale
1–10 cabinets · 0.4–4.2 MWh
4–40 cabinets · 1.7–16.7 MWh
1–4 cabinets · 0.4–1.7 MWh
Typical sites
C&I behind-the-meter, single-cabinet retrofits
Utility BESS, large industrial, FCR/aFRR plants
Solar-plus-storage rooftops, microgrids
SKU
HLY-BESS-Commercial-Industrial-418kWh
HLY-BESS-Commercial-Industrial-418kWh-DC
HLY-BESS-Commercial-Industrial-418kWh-DC + HLY-Inverter-Hybrid
Spec table reflects Mode A. Battery, BMS, thermal, and EMS identical across all three modes — only PCS strategy differs. Sizing and pairing confirmed per project at engineering review.
SYSTEM ARCHITECTURE

Built for 25 years of commercial operation.

LFP · 314 Ah · Tier-1 cells · multi-supplier homologated

Cell & Battery System

LiFePO₄, 3.2 V / 314 Ah prismatic cells, 1P416S in eight modules at 1,331 Vdc. Tier-1 cells from publicly listed manufacturers, multi-supplier homologated — no single-vendor dependency over a 25-year product life. Specific cell partner named in the supply contract, not in marketing copy.
Henley Power integrated PCS · 200 kW · ≤20 ms · 4-quadrant

Power Conversion System (PCS)

Integrated PCS at 200 kW (215 / 225 kW optional). DC range 1,040–1,498 V, AC output 690 V three-phase. Response ≤ 20 ms (inverter switching); full system activation under 500 ms — those aren’t the same number. 4-quadrant reactive power, LVRT/HVRT per grid code.
3-level · ±5 mV cell · SOC ±2% · active balancing

Battery Management System (BMS)

Three-level hierarchy: cell, module, system. A module trips without shutting the cabinet — SOC accuracy ±2%, continuous SOH tracking, active cell balancing. It’s the single biggest determinant of whether the warranty means anything over a 25-year life.
AI dispatch · OTA · Modbus TCP · IEC 61850-7-420 · DNP3

Cloud EMS & Communication

Cloud EMS, AI dispatch, OTA firmware. Open protocols: Modbus TCP/RTU, CAN, RS485, IEC 60870-5-104, IEC 61850-7-420 DER profile, DNP3. Project-specific edition confirmed at commissioning. Connects to whatever SCADA platform the customer already runs — not just the ones we’d prefer.

APPLICATIONS SCENARIOS

Where the 418 deploys.

Peak Shaving & Demand-Charge Reduction

Charge during low-tariff windows, discharge at peak demand. Cuts industrial demand charges 15–30% on properly sized sites. Not suited for whole-site islanding — that’s a multi-cabinet array application.

Solar Self-Consumption

Stores rooftop or ground-mount PV during the day, discharges into evening peak. Lifts commercial self-consumption toward 75%+ on well-matched sites. Doesn’t substitute for net-metering where export tariffs make that the better economics.

Frequency Regulation & Grid Services

≤ 20 ms PCS response qualifies for FCR-N, FCR-D, FFR, and aFRR across ENTSO-E areas. Stack 4–10 cabinets to reach minimum bid sizes — single-cabinet bids fall short on most European TSOs.

Critical-Load Backup

200 kW continuous discharge, 2-hour full cabinet duration. System activation under 500 ms — UPS-grade transition. Suited to control rooms, server rooms, and life-safety circuits.

EV Charging Hub Buffering

200 kW grid feed plus 418 kWh buffer supports 400+ kW peak charging without grid upgrade — useful for 4–8 DC fast chargers during simultaneous-charge events.

EPC Project Building Block

Stack to 16.7 MWh / 8 MW across 40 cabinets, 690 V three-phase AC interconnection with project step-up transformer for MV grids. One BOM, one warranty structure, one EMS across the array.
CERTIFICATIONS & COMPLIANCE

Certified for European deployment.

Test reports under NDA. Full bankability package on request.

IEC 62619

IEC 62477-2

IEC 62933-2-1

UL 1973

UL 9540A

EU Reg

2023/1542

CE

Declaration

UN 38.3

IEC 60721

C4

IEC 60721

C5 (opt.)

IEC 61850

-7-420 DER

IEC 60870-5-104

LiFePO₄ meets EU Battery Regulation supply-chain due diligence and carbon-footprint declaration requirements. CE marked. Battery passport readiness for the 18 February 2027 deadline. Warranty service and spare parts handled through nine active regional service centres — EU, Eastern Europe, Central Asia, Middle East, Southeast Asia, West Africa, North Africa, East Africa, and Southern Africa.

Bankability
Direct manufacturer warranty 5+5yr coverage (insurance-backed option) DFI track record (China + Chad) IEC test reports under NDA FSR documentation per-tender
FREQUENTLY ASKED QUESTIONS

Questions from engineers, developers, and EPCs.

What's the difference between the 112, 261, and 418?
Same family, three sizes, same BMS, EMS, and warranty. The 418 and 261 are liquid-cooled; the 112 is air-cooled and suited to smaller sites or milder climates. Choose by site capacity.
10,000 cycles at 80% DoD, 0.5C, 25°C, EOL at ≥70% SOH. One cycle per day = 27-year budget. Design life 25 years. Third-party test reports under NDA on request.
Yes — up to 40 cabinets in parallel, 16.7 MWh / 8 MW on one BMS and one EMS. AC interconnection at 690 V three-phase; MV grids need a project step-up transformer.
Higher voltage, lower current at the same power. Smaller cables, smaller switchgear, lower I²R losses across project life. Most C&I cabinets in this size class run 614–900 Vdc — the gap shows up in BoP cost per MWh installed.
Tier-1 LFP cells from publicly listed manufacturers, multi-supplier homologated. Specific partner named in the supply contract per project — we don’t publish it here because cell supply relationships shift across a 25-year product life.
5-year system warranty covering cells, BMS, integrated PCS, liquid cooling, and controls. 5-year battery extension pre-priced at order signing — no surprise renewals at year 5. EOL at 70% SOH. Warranty service handled regionally. Insurance-backed option available for DFI-financed and institutionally-backed tenders. Parent guarantee or escrow on request.
Open protocols — no proprietary lock-in. Modbus TCP/RTU, CAN, RS485, IEC 60870-5-104, IEC 61850-7-420 DER profile (optional), DNP3. Project-specific edition confirmed at commissioning. Compatible with major European TSO grid codes including ENTSO-E. TSO qualification (50Hertz, TenneT, RTE, Energinet, Fingrid, National Grid ESO, Transelectrica, etc.) confirmed per project. OTA firmware updates via Cloud EMS.
35 days ex-works from contract signature and deposit. CFR European ports adds 30–35 days transit. No minimum order. First EU delivery: 10 MWh, Moldova, Q2 2026.
REQUEST A QUOTE OR DATASHEET

Talk to engineering.

Engineering response within 24 hours. Sizing, grid code review, transformer selection, and preliminary SLD included in the pre-contract package at no cost.

Send your inquiry.

"*" indicates required fields

By submitting you agree to be contacted regarding this inquiry. Data handled per GDPR.
REQUEST A QUOTE OR DATASHEET

Talk to engineering.

Engineering response within 24 hours. Sizing, grid code review, transformer selection, and preliminary SLD included in the pre-contract package at no cost.

What you get

By submitting you agree to be contacted regarding this inquiry. Data handled per GDPR.

By submitting you agree to be contacted regarding this inquiry. Data handled per GDPR.

RELATED PRODUCTS

Other products in the Henley Power range.

HLY-BESS-Commercial-Industrial-261kWh

261 kWh · 1,331 Vdc · 10,000+ cycles · Liquid-cooled

HLY-BESS-Commercial-Industrial-112kWh

112 kWh · 1,331 Vdc · 10,000+ cycles · Air-cooled

HLY-EV-Charger DC Fast

DC fast charging · 60–240 kW · CCS2 / CHAdeMO / GB/T

UTILITY

HLY-BESS-Utility-3MWh · 4MWh · 5MWh

Utility-Scale BESS — 3 to 5 MWh Liquid-Cooled Container.

3–5 MWh

3,344 / 4,180 / 5,015 kWh liquid-cooled LFP in 20-ft ISO containers — grid-scale storage, frequency response, BESS-as-a-service.

View product

UTILITY

HLY-BESS-Utility-2MWh

Utility-Scale BESS — 2 MWh Containerised.

2 MWh

2,232 kWh liquid-cooled LFP in a 20-ft ISO container — IPP solar farms, wind balancing, utility substations.

View product

C&I · MODULAR · AIR-COOLED

HLY-BESS-Commercial-Industrial-Modular-16kWh

Modular HV stack BESS from 64 to 256 kWh.

64–256 kWh

Natural convection LFP. 16 kWh per module, 4–16 modules per cluster. Indoor IP21. DC-only with customer-supplied hybrid or central PCS.

View product