Projects

Thirteen commissioned and contracted energy-storage and microgrid projects across China, Moldova, Chad, and Nigeria — roughly 590 MW and 1.3 GWh delivered between 2024 and 2026. Chinese scale. Global service. The portfolio spans provincial-grid utility BESS, off-grid mining microgrids, industrial peak-shaving, and institutionally-backed first-time electrification. Every case below has a dedicated study page; contracting structure, commissioning evidence, and operational data are released under NDA on request.

Grid & Utility-Scale

Grid-scale BESS deployments paired with PV, peak-shaving, voltage support, and energy arbitrage. Six commissioned in China and one awarded utility project in the European Union.

UTILITY · CHINA

Commissioned

🇨🇳 Dezhou, Shandong

Shandong Dezhou Utility BESS

45 MW /90 MWh

Energy arbitrage · Grid support
18 × 5 MWh units for day-ahead arbitrage on regulated peak-valley tariff combined with township-level grid support.

COD Q3 2025

View case study

UTILITY · CHINA

Commissioned

🇨🇳 Shandong, China

Shandong Tire-Machinery Industrial BESS

50 MW /100 MWh

Industrial peak shaving
20 × 5 MWh units serving heavy industrial loads at a tire-machinery manufacturing facility.

COD Q3 2025

View case study

UTILITY · CHINA

Commissioned

🇨🇳 Taibus Banner, Inner Mongolia

Taibus Banner Utility BESS

100 MW /250 MWh

Grid support · Renewable integration
50 × 5 MWh units serving regional grid stability and renewable energy integration.

COD Q4 2024

View case study

UTILITY · CHINA

Commissioned

🇨🇳 Ningxia, China

Ningxia PV Farm Storage

200 MW /500 MWh

PV firming · Renewable smoothing
100 × 5 MWh units co-located with a 100 MW PV farm to smooth output and reduce curtailment.

COD Q4 2024

View case study

UTILITY · CHINA

Commissioned

🇨🇳 Inner Mongolia, China

Inner Mongolia Mining BESS

150 MW /300 MWh

Grid support · Peak shaving
60 × 5 MWh utility units supporting an industrial mining and metals processing cluster.

COD Q4 2024

View case study

Commercial & Industrial

PV-paired self-consumption, peak shaving, EV-charger buffering, and time-of-use arbitrage for agriculture, retail, office, and commercial buildings.

C&I · CHINA

Commissioned

🇨🇳 Hebei, China

Hebei Shopping Mall BESS

1.6 MW /3.34 MWh

Peak shaving · EV load buffering
8 × 418 kWh C&I units flattening transformer-side demand at a shopping mall with EV fast-chargers.

COD Q2 2025

View case study

C&I · EU

Commissioned

🇲🇩 Moldova

Moldova Agri Hybrid Storage

1.25 MW /2.61 MWh

Self-consumption · Hybrid energy
10 × 261 kWh C&I units paired with on-site PV and biogas at a large agricultural manufacturer.

COD Q2 2025

View case study

Microgrid & Off-Grid

First-time electrification of unserved townships using PV + BESS + diesel hybrid microgrids with grid-forming PCS. Institutionally-backed tenders.

MICROGRID · AFRICA

Commissioned

🇹🇩 Chad

Chad Township Microgrid

8 MW /16 MWh

First-time electrification · Hybrid microgrid
PV + BESS + diesel hybrid with grid-forming PCS, electrifying a previously unserved community. Institutionally-backed tender.

COD Q4 2025

View case study