MW-Scale Energy Storage · 9-Region Service Network

Battery energy storage, direct from the manufacturer.

LFP storage systems, power conversion, and transformers — residential units to utility-scale containers, with European projects serviced from Romania.
Chinese scale. Global service.

At a glance

Henley Power is a Chinese manufacturer of battery energy storage systems, power conversion systems, and transformers, founded in 2022 in Dezhou, Shandong Province. European projects are serviced from Romania across a nine-region network spanning Europe and Africa. The catalogue runs from residential units of a few kilowatt-hours to utility-scale containers of multiple megawatt-hours, built on Tier-1 LFP cells and backed by a direct manufacturer warranty with an insurance-backed option.

8 GWh

Annual Manufacturing Capacity

5 + GWh

Deployed Under Henley Power Brand

15 +

Countries Served

2022

Founded · $30M Registered Capital

Product platform

One manufacturer, the full storage range.

Four product classes cover the range from home batteries to grid-scale containers. Each card shows capacity, chemistry, and warranty at a commercial level — full engineering specifications live on the product pages.

C&I · LIQUID-COOLED

HLY-BESS-Commercial-Industrial-418kWh

200 kW / 418 kWh in one outdoor cabinet.

418 kWh

200 kW / 418 kWh liquid-cooled outdoor cabinet at 1,331 Vdc — industrial peak-shaving, data centres, large commercial portfolios.

View product

C&I · LIQUID-COOLED

HLY-BESS-Commercial-Industrial-261kWh

261 kWh in a single liquid-cooled cabinet.

261 kWh

Liquid-cooled outdoor cabinet, three deployment modes — All-in-One (100/110/125 kW PCS), DC-only for central PCS, or hybrid-inverter compatible.

View product

C&I · AIR-COOLED · DC

HLY-BESS-Commercial-Industrial-112kWh & 225kWh

112 or 225 kWh outdoor DC cabinet. Hybrid inverter, your choice.

112 / 225 kWh

Outdoor air-cooled DC battery cabinet for distributed C&I sites. Pairs with HLY-Inverter-Hybrid 30–125 kW. IP54.

View product

C&I · MODULAR · AIR-COOLED

HLY-BESS-Commercial-Industrial-Modular-16kWh

Modular HV stack BESS from 64 to 256 kWh.

64–256 kWh

Natural convection LFP. 16 kWh per module, 4–16 modules per cluster. Indoor IP21. DC-only with customer-supplied hybrid or central PCS.

View product

Why Henley Power

What buying direct from the manufacturer actually changes.

Single counterparty

One brand, one signatory, one warranty

Henley Power is the manufacturer — not a distributor or trading desk. The company that builds the system signs the warranty, so there’s no margin stack and no second party to chase if something needs attention.
European service

Serviced from Romania, across nine regions

European projects are supported from Romania: commissioning, remote monitoring, and spare parts held in-region. The service network covers nine regions across Europe and Africa, so support follows the project rather than the time zone.
Cell sourcing

Tier-1 LFP, multi-supplier homologated

Tier-1 LFP cells from publicly listed manufacturers, multi-supplier homologated. We don’t lock a project to a single cell vendor — the specific supplier is qualified per project and disclosed in the supply contract under NDA.
Built for diligence

Documentation lenders expect

We’re young — founded in 2022 — so we lead with deployments you can verify, not decades of brand history. The documentation package is engineered to Tier-1 lender due-diligence standards, with test reports shared under NDA.

Project finance ready

Bankability, stated plainly

An 8 GWh annual manufacturing capacity feeds a fleet now exceeding 5+ GWh deployed under Henley Power brand. Here is what that means when a lender or insurer reviews the file.

Direct manufacturer warranty

5+5-year coverage structure with a warranty-insurance option via a licensed European insurer for financed tenders. Parent guarantee or escrow alternative on request.

Verifiable track record

Chinese utility deployments across Inner Mongolia, Ningxia, Shandong, Hebei, and Henan, a Chad PV-storage-diesel microgrid, and Moldova as the first European delivery.

Documentation under NDA

IEC test reports, factory acceptance results, and grid-code compliance evidence, prepared per project and released after NDA execution.

One signatory

The manufacturer is the counterparty on supply, warranty, and documentation — no chain of intermediaries to reconcile during diligence.

Built to lender standards

The package is engineered to Tier-1 lender due-diligence standards; FSR and EU Battery Regulation documentation is supplied per tender.

What We Solve

Energy Storage for every scale.

From commercial peak shaving to utility-scale grid stabilization — complete MW-class systems with European service and warranty backing.

Utility-Scale BESS

Grid stabilization, frequency regulation, and renewable integration. Container-based systems with SCADA integration and utility-grade communications.

2 MWh – 100+ MWh

LFP

IEC 62933

C&I Energy Storage

Peak demand reduction, backup power, and energy arbitrage for industrial parks, data centers, and commercial buildings across Europe.

100 kWh – 2 MWh

Liquid Cooled

CE Certified

Microgrids & Off-Grid

Isolated grid solutions for remote industrial sites, mining operations, telecom infrastructure, and island communities in Africa and Eastern Europe.

PV + BESS

Off-Grid

EMS Included

Delivered projects

Real locations, commissioned systems.

A selection from the project portfolio. Each links to a full case study with the facts behind it.

Chad Township Microgrid

PV + BESS + diesel hybrid with grid-forming PCS, electrifying a previously unserved community. Institutionally-backed tender.

Hebei Shopping Mall BESS

Moldova Agri Hybrid Storage

Shandong Dezhou Utility BESS

Shandong Tire-Machinery Industrial BESS

Certifications & standards

Documented to recognised standards.

Systems are built and tested to international standards, with certificates and factory test reports supplied per project. Grid-code coverage spans 25+ countries; specifics are confirmed per project.

CE

EU Directive

IEC 62619

Cell Safety

IEC 62933

BESS System

EU 2023/1542

Battery Reg.

UN 38.3

Transport

UN 3536

Lithium Install

ISO 9001

Quality

ISO 14001

Environment

ISO 45001

H&S

REACH

EU Compliance

TÜV

On Request

Battery Passport

2027 Ready

EU Battery Regulation

Cobalt-free LFP, Reg 2023/1542 compliant.

LiFePO₄ chemistry meets EU Battery Regulation supply-chain due diligence and carbon footprint declaration requirements. CE marked. Battery passport ready for the 18 February 2027 deadline. EU-based warranty service and spare parts logistics — no dependency on Chinese service channels for European projects.

Our manufacturing

Built in Dezhou, Shandong.

Founded 2022 with $30M registered capital, the factory campus runs on KUKA assembly robotics, HIOKI 3561 cell sorting, Ainuo 9-level arc-detection insulation testers, and ring-pattern laser welding. R&D collaboration with Soochow University, Shandong University, Wuhan University of Technology, and Huawei’s technology team. Five group companies under one quality system.

5

Group Companies
 

50k

Factory Floor

500+

Employees

8 GWh

Production Capacity

● LIVE FROM FACTORY

Knowledge Base

BESS Insights for European Buyers.

Completed installations with documented performance. Our contracts and factory portfolio — real numbers, real locations.

Common questions

Questions buyers, developers, and lenders ask Henley Power.

What does Henley Power manufacture?
Henley Power manufactures lithium-iron-phosphate (LFP) battery energy storage systems, power conversion systems, transformers, and switchgear. The range runs from residential units of a few kilowatt-hours to utility-scale containers of multiple megawatt-hours, plus the balance-of-system equipment around them.
Henley Power is headquartered in Dezhou, Shandong Province, China, and was founded in 2022. European projects are serviced from Romania across a nine-region service network covering Europe and Africa.
Warranty insurance via licensed European insurer is available as a project option for DFI-financed and institutionally-backed tenders. Parent guarantee or escrow alternative on request.
Tier-1 LFP cells from publicly listed manufacturers, multi-supplier homologated. The specific cell supplier is qualified per project and disclosed in the supply contract and bankability dossier under NDA.
Compatible with major European TSO grid codes including ENTSO-E network code requirements. Specific TSO qualification (50Hertz, TenneT, RTE, Energinet, Transelectrica, etc.) is confirmed per project and validated at commissioning against the operator’s interconnection agreement.
Henley Power carries a direct manufacturer warranty with a 5+5-year structure and a documentation package engineered to Tier-1 lender due-diligence standards. The track record covers Chinese utility deployments and a Chad PV-storage-diesel microgrid, with Moldova as the first European delivery. Test reports and factory acceptance documentation are shared under NDA.

Trusted by Projects Across Europe & Africa

Talk to engineering

"*" indicates required fields

Ready to Start

Tell Us About Your Project

Send us your load profile, site location, and target capacity. We respond within 24 hours with a preliminary specification and indicative pricing.